Project portfolio

Proven across scale and applications

Selected experience across utility-scale solar, industrial rooftops, O&M, energy storage and distributed-energy infrastructure in Bangladesh.

  • 300+ MWp participation
  • 100+ MWp rooftop
  • 150+ MWp under O&M
  • 1 MW+ BESS
How to read this portfolio C-Part Contractor means local civil, mechanical and electrical construction under a separate Main EPC. 'EPC Partner' is used only where supported by project records. Capacities shown are total project capacities, not SEDCOL's sole-contractor delivered capacity.
Utility-scale solar

Selected utility-scale projects

Project Capacity Client / Main EPC SEDCOL Role Year
Sirajganj Solar Project 68 MW AC / 85 MWp DC BCRECL / CMC C-Part Contractor 2024
Pabna Solar Project 64 MW AC / 84 MWp DC BCRECL / CMC C-Part Contractor 2025
Mymensingh Solar Park 50 MW AC / 73.8 MWp DC HDFC Sinpower Ltd. / Fujian Yongfu C-Part Contractor 2020
Teknaf Solar Park 20 MW AC / 28 MWp DC Technaf Solartech Energy Ltd. (TSEL) EPC Partner 2018
NWPGCL Sirajganj Solar Park 6.55 MW AC / 7.8 MWp DC North-West Power Generation Company Ltd. (NWPGCL) / PowerChina Zhongnan C-Part Contractor 2021
Ground-mounted solar array at a grid-connected solar power plant in Bangladesh C-Part Contractor Representative image

Utility-Scale Solar

Sirajganj Solar Project

68 MW AC / 85 MWp DC

Client:
BCRECL
Main EPC:
CMC
Location:
Sirajganj, Bangladesh
Commissioned 2024 View project
Rows of ground-mounted solar modules at a utility-scale solar plant in Bangladesh C-Part Contractor Representative image

Utility-Scale Solar

Pabna Solar Project

64 MW AC / 84 MWp DC

Client:
BCRECL
Main EPC:
CMC
Location:
Pabna, Bangladesh
Commissioned 2025 View project
Aerial view of a 50 MW grid-connected solar power plant beside a river in Bangladesh C-Part Contractor

Utility-Scale Solar

Mymensingh Solar Park

50 MW AC / 73.8 MWp DC

Client:
HDFC Sinpower Ltd.
Main EPC:
Fujian Yongfu
Location:
Sutiakhali, Gauripur, Mymensingh, Bangladesh
Grid-Connected 2020 View project
Aerial view of a utility-scale solar power plant and its substation in Bangladesh EPC Partner Representative image

Utility-Scale Solar

Teknaf Solar Park

20 MW AC / 28 MWp DC

Client:
Technaf Solartech Energy Ltd. (TSEL)
Location:
Alikhali, South Nhila, Teknaf, Cox’s Bazar
Commercial Operation 2018 View project
Ground-mounted solar array at the Sirajganj grid-connected solar photovoltaic power plant C-Part Contractor

Utility-Scale Solar

NWPGCL Sirajganj Solar Park

6.55 MW AC / 7.8 MWp DC

Client:
North-West Power Generation Company Ltd. (NWPGCL)
Main EPC:
PowerChina Zhongnan
Location:
Soyedpur, near Jamuna Bridge, Sirajganj, Bangladesh
Operational Since 2021 View project
Industrial & public-sector rooftop

Rooftop solar at scale

More than 100 MWp of grid-connected rooftop systems — from 100 kWp installations to Bangladesh’s largest single-phase rooftop solar project.

Grid-tied solar modules installed across an industrial rooftop in Bangladesh EPC Partner Representative image

Industrial Rooftop Solar

Meghnaghat Industrial Rooftop Solar

22.69 MWp DC

Client:
SSEL — Meghna Group of Industries
Location:
Meghnaghat, Sonargaon, Narayanganj, Bangladesh
Completed 2023 View project

Rooftop Solar

NWPGCL Rooftop Project

1.7 MW

2026 rooftop project

OMERA Solar rooftop portfolio

Selected OMERA-invested projects constructed, installed, tested and commissioned by SEDCOL across Bangladesh.

Tarasima Apparels Manikganj
3.6 MW
Apex Footwear East Chandra, Gazipur
2.9 MWp
Fakir Fashion Rupganj, Narayanganj
1.6 MW
Esquire Jamaldi, Gazaria, Munshiganj
1.2 MWp
Santic Bangladesh Ashulia, Savar
712 kWp
Ananta Casual K.B. Bazar, Gazipur
626 kWp
MAF Footwear Nasirabad I/A, Chattogram
565 kWp
Edison Footwear Hotapara, Gazipur
348.88 kWp
Role clarityOMERA Solar invested in the listed projects. SEDCOL executed the defined construction and installation works, including mounting structures, module installation, DC/AC electrical works, testing and commissioning. The portfolio does not present SEDCOL as project investor, owner or sole EPC contractor.
Mini-grids & distributed energy

Selected mini-grid references

SolarElectro Mini-Grid — Phase 1 Nowapara Bazar, Shariatpur • Client: Solar Electro Bangladesh Ltd.
250 kWp
SolarElectro Mini-Grid — Phase 2 Murdamiar Bazar, Shariatpur • Client: Solar Electro Bangladesh Ltd.
250 kWp
Monpura Mini-Grid Bangla Bazar, Monpura, Bhola • Client: Solar Electro Bangladesh Ltd.
177 kWp
AVA Mini-Grid Ansariadaha, Godagari, Rajshahi • Client: AVA Development Society
148.5 kWp
Complementary experience

Beyond utility-scale

Mini-Grids

4 projects • 825+ kWp combined capacity • SolarElectro and AVA

Irrigation

Solar low-lift and drip irrigation • BADC • Bandarban and Rangamati

Public Infrastructure

Solar street lighting • Dhaka EPZ • Chattogram EPZ • BEPZA Economic Zone, Mirsarai

Lifecycle Services

150+ MWp under O&M • 8 field teams • Monitoring, maintenance and reporting

Ready to deliver your next energy project

Let’s build a cleaner energy future

From complex construction and commissioning to long-term asset performance, SEDCOL is ready to support your next renewable-energy project.

  • Utility Solar
  • Rooftop
  • BESS
  • Distributed Energy